Building Information

GREENBRIAR BUILDING
Wiring — Complete
Greenbriar Building construction began in September 2005. Network wiring for the building is completed.
Wireless
The following maps contain planned wireless zones for this building. The location of each wireless access point is marked by the symbol in the legend below:

First Floor:

Second Floor:

