Track our progress through these photos; most recent photos are shown first.

On November, 19, the integration of the new network core and the existing network core was successful. The work was conducted between 2:00 a.m. and 6:00 a.m. and all Internet services were operational by 7:00 a.m.

The new network core in Mudd, November 3, 2005.

A new wiring closet in Continuing Studies, November 3, 2005.

Another wiring closet in the Media Center, November 3, 2005.

Yet another closet in Hamman Hall, November 2, 2005.

Wire running throguh Herman Brown, November 2, 2005.

Installers hard at work in Mudd lab, October 28, 2005.

Herman Brown Hall gets a new wiring closet, September 15, 2005.

Initial cables run through the hallway at Keith-Wiess Labs, September 15, 2005.

Cables run through the walls in Keith Wiess.

An installer checks the new cable route in Keith-Wiess, September 15, 2005.

Cohen House station cable feeds, September 7, 2005.

Initial cable at Hamman Hall, September 7, 2005.

Core Switches arrive, September 4, 2005.

More core switches.

Wiring Closet #1 - Cohen House, August 22, 2005

Wiring Closet #2, Cohen House, August 22, 2005

Cohen House equipment frame, August 24, 2005.

Unboxing network components, May 2005.

More network components arrive, May 2005.

Connecting to the temporary core, May 2005.

Further connections to the temporary core.

Connecting to the test lab, May 2005.

Additional connections to the test lab.